Makete Integrated Rural Transport Project Reading Ielts Answers and Questions

The Blog post contains the following IELTS Reading Questions:

  • IELTS Reading Yes/ No/ Not Given
  • IELTS Reading Matching Sentence Endings
  • IELTS Reading Matching Headings
  • IELTS Reading Multiple Choice Questions

Stay informed and prepared for success – Explore our comprehensive Reading Test Info page to get valuable insights, exam format details, and expert tips for mastering the IELTS Reading section.

IELTS Reading Passage – Makete Integrated Rural Transport 

Makete Integrated Rural Transport 

The disappointing results of many conventional road transport projects in Africa led some experts to rethink the strategy by which rural transport problems were to be tackled at the beginning of the 1980s. A request for help in improving the availability of transport within the remote Makete District of southwestern Tanzania presented the opportunity to try a new approach.

The concept of ‘integrated rural transport’ was adopted in the task of examining the transport needs of rural households in the district. The objective was to reduce the time and effort needed to obtain access to essential goods and services through an improved rural transport system. The underlying assumption was that the time saved would be used instead for activities that would improve the social and economic development of the communities. The Makete Integrated Rural Transport Project (MIRTP) started in 1985 with financial support from the Swiss Development Corporation and was coordinated with the help of the Tanzanian government.

When the project began, Makete District was virtually totally isolated during the rainy season. The regional road was in such bad shape that access to the main towns was impossible for about three months of the year Road traffic was extremely rare within the district, and alternative means of transport were restricted to donkeys in the north of the district. People relied primarily on the paths, which were slippery and dangerous during the rains.

Before solutions could be proposed, the problems had to be understood. Little was known about the transport demands of rural households, so Phase I, between December 1985 and December 1987, focused on research. The socio-economic survey of more than 400 households in the district indicated that a household in Makete spent, on average, seven hours a day on transporting themselves and their goods, a figure which seemed extreme but which has also been obtained in surveys in other rural areas in Africa. Interesting facts regarding transport were found: 95% was on foot; 80% was within the locality; and 70% was related to the collection of water and firewood and traveling to grinding mills. 

Having determined the main transport needs, possible solutions were identified which might reduce the time and burden. During Phase II, from January to February 1991, a number of approaches were implemented in an effort to improve mobility and access to transport.

An improvement of the road network was considered necessary to ensure the import and export of goods to the district. These improvements were carried out using methods that were heavily dependent on labour In addition to the improvement of roads, these methods provided training in the operation of a mechanical workshop and bus and truck services. However, the difference from the conventional approach was that this time consideration was given to local transport needs outside the road network.

Most goods were transported along the paths that provide shortcuts up and down the hillsides, but the paths were a real safety risk and made the journey on foot even more arduous. It made sense to improve the paths by building steps, handrails, and footbridges.

It was uncommon to find means of transport that were more efficient than walking but less technologically advanced than motor vehicles. The use of bicycles was constrained by their high cost and the lack of available spare parts. Oxen were not used at all but donkeys were used by a few households in the northern part of the district. MIRTP focused on what would be most appropriate for the inhabitants of Makete in terms of what was available, how much they could afford, and what they were willing to accept.

After careful consideration, the project chose the promotion of donkeys – a donkey costs less than a bicycle – and the introduction of a locally manufacturable wheelbarrow.

At the end of Phase II, it was clear that the selected approaches to Makete’s transport problems had had different degrees of success. Phase III, from March 1991 to March 1993, focused on the refinement and institutionalization of these activities.

The road improvements and accompanying maintenance system had helped make the district center accessible throughout the year. Essential goods from outside the district had become more readily available at the market, and prices did not fluctuate as much as they had done before.

Paths and secondary roads were improved only at the request of communities who were willing to participate in construction and maintenance. However the improved paths impressed the inhabitants, and requests for assistance greatly increased soon after only a few improvements had been completed.
The efforts to improve the efficiency of the existing transport services were not very successful because most of the motorized vehicles in the district broke down and there were no resources to repair them. Even the introduction of low-cost means of transport was difficult because of the general poverty of the district. The locally manufactured wheelbarrows were still too expensive for all but a few of the households. Modifications to the original design by local carpenters cut production time and costs. Other local carpenters have been trained in the new design so that they can respond to requests. Nevertheless, a locally produced wooden wheelbarrow which costs around 5000 Tanzanian shillings (less than US$20) in Makete, and is about one-quarter the cost of a metal wheelbarrow, is still too expensive for most people.

Donkeys, which were imported to the district, have become more common and contribute, in particular, to the transportation of crops and goods to market. Those who have bought donkeys are mainly from richer households but, with an increased supply through local breeding, donkeys should become more affordable. Meanwhile, local initiatives are promoting the renting out of the existing donkeys.

It should be noted, however, that a donkey, which at 20,000 Tanzanian shillings costs less than a bicycle, is still an investment equal to an average household’s income over half a year This clearly illustrates the need for supplementary measures if one wants to assist the rural poor.

It would have been easy to criticize the MIRTP for using in the early phases a ‘top-down’ approach, in which decisions were made by experts and officials before being handed down to communities, but it was necessary to start the process from the level of the governmental authorities of the district. It would have been difficult to respond to the requests of villagers and other rural inhabitants without the support and understanding of district authorities.

Today, nobody in the district argues about the importance of improved paths and inexpensive means of transport. But this is the result of dedicated work over a long period, particularly from the officers in charge of community development. They played an essential role in raising awareness and interest among the rural communities.

The concept of integrated rural transport is now well established in Tanzania, where a major program of rural transport is just about to start. The experiences from Makete will help in this initiative, and Makete District will act as a reference for future work.

Unlock your full potential in the IELTS Reading section – Visit our IELTS Reading Practice Question Answer page now!

Recommended Questions:

Renewable Energy IELTS Reading Question with Answer

Questions

Questions 1-4

Reading Passage has six sections, A-F. Choose the correct heading for sections B, C, E, and F from the list of headings below. Write the correct number, i-xi, in boxes 1-4 on your answer sheet.

List of Headings

i.   MIRTP as a future model
ii.  Identifying the main transport problems
iii.  Preference for motorized vehicles
iv.  Government authorities’ instructions
v.  Initial improvements in mobility and transport modes
vi.  Request for improved transport in Makete
vii.  Transport improvements in the northern part of the district
viii.  Improvements in the rail network
ix.  Effects of initial MI RTP measures
x.  The cooperation of district officials
xi.  Role of wheelbarrows and donkeys

Example            Answer   
Section A                vi

1. Section B -____

2. Section C -____

Example            Answer   
Section D                ix

3. Section E -____

4. Section F -____

Ready to conquer Matching Headings questions? Click here to learn essential tips and techniques for matching headings accurately to paragraphs or sections in the IELTS Reading section.

Questions 5-9

Do the following statements agree with the claims of the writer in Reading Passage? In boxes 5-9 on your answer sheet, write

  • YES                  if the statement agrees with the claims of the writer
  • NO                    if the statement contradicts the claims of the writer
  • NOT GIVEN     if it is impossible to say what the writer thinks about this

5. MIRTP was divided into five phases.
6. Prior to the start of MIRTP the Makete district was almost inaccessible during the rainy season.
7. Phase I of MIRTP consisted of a survey of household expenditure on transport.
8. The survey concluded that one-fifth or 20% of the household transport requirement is outside the local area.
9. MIRTP hoped to improve the movement of goods from Makete district to the country’s capital.

Want to excel in identifying the writer’s views and claims? Click here to explore our in-depth guide on how to accurately determine Yes, No, or Not Given in the IELTS Reading section.

Questions 10-13

Complete each sentence with the correct ending, A-J, below.

Write the correct letter, A-J, in boxes 10-13 on your answer sheet.

10. Construction of footbridges, steps, and handrails – ____
11. Frequent breakdowns of buses and trucks in Makete -____
12. The improvement of secondary roads and paths -____
13. The isolation of Makete for part of the year -____

  • provided the people of Makete with experience in running bus and truck services
  • was especially successful in the northern part of the district.
  • differed from earlier phases in that the community became less actively involved.
  • improved paths used for transport up and down hillsides.
  • was no longer a problem once the roads had been improved.
  • cost less than locally-made wheelbarrows.
  • was done only at the request of local people who were willing to lend a hand.
  • was at first considered by MIRTP to be affordable for the people of the district.
  • hindered attempts to make the existing transport services more efficient.
  • was thought to be the most important objective of Phase III.

Ready to sharpen your skills in Matching Sentence Endings? Click here to discover expert strategies and techniques for accurately matching sentence endings with the corresponding information in the IELTS Reading section.

Question 14

Choose the correct letter, A, B, C, or D.

Write the correct letter in box 14 on your answer sheet.

14. Which of the following phrases best describes the main aim of Reading Passage?

A. to suggest that projects such as MIRTP are needed in other countries
B. to describe how MIRTP was implemented and how successful it was
C. to examine how MIRTP promoted the use of donkeys
D. to warn that projects such as MIRTP are likely to have serious problems

Ready to improve your performance in Multiple Choice Questions (MCQs)? Click here to access our comprehensive guide on how to tackle MCQs effectively in the IELTS Reading section.

Unlock your full potential in the IELTS Reading section – Visit our IELTS Reading Practice Question Answer page now!

Recommended Questions:

Renewable Energy IELTS Reading Question with Answer

Answers for Makete Integrated Rural Transport Project

1. Answer: ii
2. Answer: v
3. Answer: x
4. Answer: i
5. Answer: No
6. Answer: Yes
7. Answer: No 
8. Answer: Yes 
9. Answer: Not given
10. Answer: D
11. Answer: I
12. Answer: G
13. Answer: E
14. Answer: B

Purchase-IELTS-Writing-Correction-with-feedback-today

We hope you found this post useful in helping you to study for the IELTS Test. If you have any questions please let us know in the comments below or on the Facebook page.

The best way to keep up to date with posts like this is to like us on Facebook, then follow us on Instagram and Pinterest. If you need help preparing for the IELTS Test, join the IELTS Achieve Academy and see how we can assist you to achieve your desired band score. We offer an essay correction service, mock exams and online courses.

Scroll to Top